Second Saturday Trip
June 13 @ 10:00 am - 5:00 pm
Thrupe Lane Swallet / Hobnail Hole
Duration – 3 – 4 hours.
Location – Meet at Upper Pitts at 10:00.
The plan is to rig Thrupe Lane Swallet for an SRT visit to the bottom.
This will entail the entrance pitch, Perseverance Pot, followed by Marble Streamway to Atlas pot.
Atlas pot will be descend by either the Lateral Pitch or Slither Pot.
An alternative non-SRT trip will be offered down Hobnail (weather permitting) and will join Thrupe Lane Swallet at Butt’s Chamber and proceed down Marble Streamway to Atlas pot.
Full SRT kit will be needed for the Thrupe Lane Swallet route and no special equipment will be needed for the Hobnail route.