Loading Events

« All Events

  • This event has passed.

Hut Building Weekend

May 12 - May 14

Event Navigation

A list of the work that is hoped to be done is being prepared by the Hut Admin Officer.

Could include:

  • Tidy up outside eg strim edges.
  • Bunkrooms – wash down mouldy walls and paint.
  • Repair stile.
  • Washdown pvc windows/facia etc.
  • Remove old MRO socket.
  • Repair/replace Drying Room door/frame.
  • Clean and paint old metal window frames.
  • Sort out kitchen windows that are seized up.
  • Split large logs.
  • Dust and clean rooms as required.

Details

Start:
May 12
End:
May 14
Event Tags: